Supply of equipment, goods and services for civil works, electromechanical and electrical assembly in Pelotas Substation 1 project at voltage level 138 / 13.8kV. Installation of 138 kV ring bus modules. Mounting two 138 / 13.8 kV – 25 MVA Transformers with 13.8 kV TR sector connection module. Feeder modules execution, transfer modules and 13.8 kV bar measuring modules. Execution infrastructure assembly Capacitor Bank complete, 3.6 MVAr. Auxiliary Services transformer module. Complete installation of the fire fighting patio system and command room. Execution of the system external lighting of the substation.

Construction of Control Room for Supervision and Control Panels shelter and Auxiliary Services System and Security Guard building; Construction of the entire drainage system, cable ducts, urbanization, paving, foundations, earthworks and closure; Supply of materials and electromechanical assembly of all infrastructure necessary for implementation and energization of the Substation.

SCOPE DETAIL


Civil


  • Foundations;
  • Courtyard drainage;
  • Slope drainage;
  • Channel construction;
  • Urbanization;
  • Paving;
  • Command house construction.

Electromechanical


  • Equipment assembly;
  • Release of earth mesh;
  • Assembly and installation of panels;
  • Release of cables;
  • Commissioning support;
  • Physical tests.