ETSE – GASPAR


Civil construction works and electromechanical assembly services including launching and interconnecting cables in the 138 / 230KV sectors installation of 01 150 MVA 230 / 138KV transformer at the SE Gaspar 2 plant.

SCOPE DETAIL


Civil


  • Foundations;
  • Installation of 230/138KV gantries;
  • Piling;
  • Drainage system construction;
  • Channel construction;
  • Courtyard crushing;
  • Earth mesh excavation;
  • Street construction;
  • Courtyard soil compaction.

Electromechanical


  • Assembly of equipment;
  • of 230KV disconnect switches;
  • Assembly Switches 138 KV;
  • Assembly of 230 KV Circuit Breakers;
  • Assembly of Circuit Breakers 138 KV;
  • Assembly TC 138/230 KV;
  • Assembly of TPCs 138 / 230KV;
  • Release of earth mesh;
  • Installation and assembly of panels;
  • Rigid busbar mounting;
  • Commissioning Support;
  • Launch / Interconnection of sector 138 / 230KV cables;
  • Physical tests.