Project São Francisco

Project São Francisco

CONTRACTOR: Sterlite

OWNER: Sterlite

2022 – Olindina, Sapeaçu, Porto Sergipe, Irecê e Morro do Chapéu – Bahia e Sergipe

Complete construction containing all stages, earthmoving, civil construction, electromechanical assembly, electrical assembly, in addition to partial supply of materials and support for the commissioning of the facilities of the São Francisco Project, lot 002/2018 of the ANEEL Auction.

Scope Details

SE Harbor of Sergipe 500kv

  •  1 Line Input Module – DJM – 500kV;
  • 4 Modules of SMF (TP+TC+Med) – DJM – 500kV;
  •  1 Module connection of Line Reactor without circuit breaker – 500kV;
  •  4 Power Line Single Phase Reactor Units 33,3 MVAr any – 500kV;
  •  1 Module barr interconnection – DJM – 500kV;
  •  1 Module of barr reator connection – 500kV e
  •  4 Units of single phase barr reactor of 50 MVAr any – 500kV.

SE olindina 500kv

  • 2 Módulos de Entrada de Linha – DJM – 500Kv;
  • 2 Módulos de conexão de Reator de Linha sem disjuntor – 500kV;
  • 8 Unidades de Reator Monofásico de Linha de 33,3 MVAr cada – 500kV;
  • 2 Módulos de Interligação de Barras – DJM – 500kV;
  • 1 Módulo de conexão de Reator de Barra – 500kV 
  • 4 Unidades de Reator Monofásico de Barra de 50 MVAr cada – 500kV.

SE sapeaçu 500kv

  • 1 Bar Interconnection Module – DJM – 500kV;
  • 1 Line Input Module – DJM – 500kV;
  • 1 Line Reactor connection module without circuit breaker – 500kV
  • 4 Line Single Phase Reactor Units of 33,3 MVAr any – 500kV.

SE Morro do Chapéu II 230kV

  • 2 Line Input Modules – BD4 – 230kV

SE Irecê 230kV

  • 2 Line Input Modules –BD5 – 230kV