CONTRACTOR: Renova Energia S.A

OWNER: Renova Energia S.A

2018 – Caetité, Bahia

Installation of input modules with maneuvering and busbar infrastructure at 34.5kV for interconnection of Collecting Networks to transformers;

Installation of 2 (two) 34.5-230kV elevation modules for 34.5-230kV transformers and connections with maneuvers of transformation modules with 230kV outputs;

The installation of 2 (two) maneuver modules for feeder line outputs of the 230kV circuits to Pindaí;

Construction of a Command Room for the Supervision and Control Panels and Auxiliary Services System and Construction of a Room for the GMG Shelter;

Construction of the entire drainage system, cable channels, urbanization, paving, foundations, earth mesh and closure; Supply of materials and electromechanical assembly of all the necessary infrastructure for the implementation and energization of the Substation.

Scope Details

Civil

Eletromecânico